The room could require a 2 hour rating a 1 hour rating or no fire rating.
Do awnings need fire rating ibc.
Rating hours fire walls and fire barriershaving a required fire resistance rating greater than 1 hour.
Building codes define requirements for fire ratings fire protection egress and accessibility.
Just because certain code verbiage or annex material exists does not mean you as a designer engineer or review authority should forfeit good judgment or common sense.
This means that wall assemblies including those containing sprayfoam insulation must be tested in accordance with astm e 119 to determine its hourly fire resistance rating to determine if it can be used within a specific building type.
The fire resistance rating for exterior walls is based on construction type occupancy and fire separation distance as defined in section 6 of the ibc.
For separating group s 1 fire areas from group s 1 fire areas a 3 hour rated fire barrier is required.
Shaft exit enclosure and exit passageway walls 11 other fire barriers 1 3 4 fire partitions corridor walls 1 0 5 1 3ᵇ 1 3ᵇ other fire.
Then the ibc adjusts the hourly fire resistance ratings depending on the occupancy of the building.
Good design judgement before diving in on whether sprinklers are required or not remember that good design judgement is always important.
Exterior walls generally have a rating based solely on interior occupancy use and structural requirements.
The international codes i codes are the widely accepted comprehensive set of model codes used in the us and abroad to help ensure the engineering of safe sustainable affordable and resilient structures.
4 3 2 1 1 2 3 3ª 1 1 2 1 1 2 fire barriers having a required fire resistance rating of 1 hour.
These fire resistance requirements range from no required rating to 3 hours.
The two main building codes which dictate this are the ibc international building code and the nfpa national fire protection association s codes nfpa 5000 building construction and safety code and nfpa 101 life safety code.
The best way to answer the question is to review what type of equipment is being installed in the mechanical room then go to the various nfpa or icc standards for the equipment.